Estos son las últimas colaboraciones que se han realizado con empresas privadas.

2023


  • Analysis of the participation of energy storage systems in the frequency regulation services operated by PJM, NYISO and ERCOT (28/04/2023-28/07/2023). Alternative Green Engineering SXXI S.L.
  • Optimal sizing of energy storage systems for their integration in renewable power plants (23/02/2023-22/11/2023). Client/Funding institution: CUERVA Energía

2022


  • Analysis of variable speed generators application to ENEL hydro power plants (01/06/2021-31/08/2022). Client/Funding institution: ENEL.
  • Tool for the visualization of generation schedules of generating units operating in the Spanish electric power system (12/07/2021-31/03/2022). Client/Funding institution: SEG Hidroeléctrica.
  • Stochastic optimization model for the short-term generation of a Virtual Power Plant with wind generation, pumped-storage and batteries (01/09/2020-31/08/2021). Client/Funding Institution: Fundación Iberdrola.

2021


  • Proposal of remuneration mechanisms to guarantee the feasibility of energy storage projects in the Spanish electric power system (phase 2) (24/05/2021-31/08/2021). Client/Funding institution: Energías Renovables del Bierzo.
  • Tool for the visualization of generation schedules of generating units operating in the Spanish electric power system (12/07/2021-31/03/2022). Client/Funding institution: SEG Hidroeléctrica.

2020


  • Stochastic optimization model for the short-term generation of a Virtual Power Plant with wind generation and energy storage (01/09/2019-30/09/2020). Client/Funding Institution: Fundación Iberdrola.
  • Simulation model for the dynamic response analysis of Mpatamanga hydropower plant during frequency control maneuvers (30/03/2020-24/05/2020). Client/Funding institution: SN Power (through GEA Ingeniería e Informática, S.L.).
  • Proposal of remuneration mechanisms to guarantee the feasibility of energy storage projects in the Spanish electric power system (22/06/2020-22/09/2020). Client/Funding institution: Energías Renovables del Bierzo S.L.

2019


    2018


    • Technical advisory for inclusion of the purifying pumped-hydro energy storage project P-PHES Cúa on the fourth list of Projects of Common Interest of the European Commission (01/10/2018-31/07/2019). Client/Funding institution: Energías Renovables del Bierzo.

    2017


    • Revenue assessment of Béznar-Rules pumped-storage power plant in the energy and ancillary services markets of the Spanish power system (01/06/2017-30/06/2017). Client/Funding institution: SEG Hidroeléctrica.

    2016


    • Analysis of the technical and economic operation of the Spanish closed-loop pumped-storage power plants (01/01/2016-30/09/2016). Client/Funding institution: Energías Renovables del Bierzo.
    • Long- and short-term scheduling models of a Spanish hydropower system (12/09/2016-31/07/2017). Ciente/Institución financiadora: Spanish National Markets and Competition Commission.

    2015


    • Purifying pumped-hydro energy storage P-PHES NAVALEO (01/04/2015-31/07/2017). Client/Funding institution: Energías Renovables del Bierzo.
    • Configuration of Chira-Soria pumped-storage power plant units (01/06/2015-30/09/2015). Client/Funding institution: IDOM.
    • Analysis of the regulations of the electricity and reserve markets in the Pacific Northwest Electricity Markets (01/10/2015-31/12/2015). Client/Funding institution: Agazos S.L.

    2014


    • Revenue assessment of a pumped-storage power plant in the energy and secondary regulation reserve markets of the Spanish power system (11/12/2013-30/04/2014). Client/Funding institution: Energías Renovables del Bierzo.
    • Hydrological modeling of Molloco river basin (01/02/2014-30/04/2014). Client/Funding institution: Parangón Consulting.
    • Report on Medium-term hydropower generation scheduling in a liberalized electricity market (17/11/2014-31/01/2015). Client/Funding institution: Iberdrola.

    2013


    • Optimal operation and control of a system of hydropower reservoirs with environmental requirements (01/01/2013-31/12/2013). Client/Funding institution: SEG Hidroeléctrica, Tagus River Basin Authority.

    2012


    • Preliminary study of alternatives for the load-frequency control in Los Silos pumped-storage power plant (01/12/2011-31/12/2012). Client/Funding institution: PROINTEC, ENDESA.
    • Procedures for optimal flood control in hydropower reservoirs (01/01/2012-31/07/2013). Client/Funding institution: Gas Natural Fenosa Engineering.
    • Analysis of failures in the operation of Tambre II hydropower plant during load-frequency control manoeuvres (01/01/2012-31/12/2013). Client/Funding institution: Gas Natural Fenosa Engineering.

    2011


    • Optimal annual operation of Belesar I + Belesar II hydropower plant (01/06/2011-30/09/2011). Client/Funding institution: SOCOIN.
    • Optimal scheduling models of hydropower systems. Application to variable speed hydropower generation (01/10/2011-30/11/2012). Client/Funding institution: SEG Hidroeléctrica, SIGMA PRIMA, C.R. Los Sauces.
    • Interest of the repowering of a hydropower plant in the framework of the Spanish Electricity Market. A producer’s perspective (01/11/2011-28/02/2012). Client/Funding institution: SEG Hidroeléctrica, Ebro River Basin Authority.
    • Prediction of average monthly prices in the day-ahead electricity spot market of the Spanish power system. (01/03/2021-30/11/2021). Client/Funding institution: SEG Hidroeléctrica.

    2010


      2009


      • Optimal scheduling model of a system of hydropower reservoirs coupled to mitigate flow variations (01/01/2009-31/12/2009). Client/Funding institution: SOCOIN.

      2008


      • Preliminary study of the dynamic response and stability of Amaime run-of-river hydropower plant (01/06/2008-31/07/2008). Client/Funding institution: SOCOIN.
      • Preliminary study of the operation of a pumped-storage power plant coupled to a desalination plant (01/10/2008-31/12/2008). Client/Funding institution: Desaladoras AVF.

      2006


      • Development of a dynamic simulation model of a complex hydraulic system. Application to the well-field system of Guadarrama river basin (01/12/2006-12/05/2008). Client/Funding institution: Canal de Isabel II (Madrid’s Water Supply Company).